News

Consedo post image

Operator pre-qualification

Published 20/10/2025

Concedo received the operator pre-qualification letter from the Ministry of Energy on Thursday 16th October 2025. Final approval of Concedo as operator will be when Concedo obtains a production license as operator.


Consedo post image

Concedo with 15% in oil discovery in the Northern North Sea

Published 26/03/2025

A quote from DNO’s announcement today: Oslo, 26 March 2025 – DNO ASA, the Norwegian oil and gas operator, today announced an important oil and gas discovery in Northern North Sea license PL1182 S in which the Company holds a 40 percent operated interest. The discovery was made in Paleocene... More


Consedo post image

Concedo awarded three licences in the APA 2024

Published 14/01/2025

Concedo is pleased with the award of three North Sea licences in the APA 2024: PL 1251: DNO Norge AS (op) 50%    Concedo AS 50% PL 1253: A/S Norske Shell (op) 30%   Concedo AS 20%   Equinor Energy AS 30%   Petoro AS 20% PL 1254:  Vår Energi ASA (op) 40% ... More


Consedo post image

Dry well in the North Sea (24/12-8 S)

Published 14/01/2025

The Norwegian Offshore Directorate: 14/01/2025 Aker BP and its partner Concedo drilled the dry well 24/12-8 S near the Bøyla field in the North Sea. This well, “Rumpetroll South”, is a follow-up to the discovery made in well 24/9-13 – “Rumpetroll”, in 2019. The wells are located in production licence 869. This production... More



Consedo post image

Concedo aquires 20% of the Bøyla production asset from Vår Energi

Published 24/05/2024

Vår Energi’s stock exchange anouncement: 24.05.2024 14:47:41 Vår Energi sells Bøyla asset as part of portfolio optimisation Vår Energi ASA Sandnes, Norway 24 May 2024: Vår Energi ASA (OSE: VAR) has signed an agreement with Concedo AS for the disposal of a 20% interest in the Bøyla field for a... More